Thursday, April 10, 2025
Progress report 2 on maintenance
Thursday, April 3, 2025
Progress on maintenance
Tuesday, March 28, 2023
A great new tool
Sunday, August 9, 2020
New stuff
Hello, everyone.
As things go, one of the plastic legs on my keyboard broke. (I loved that keyboard!)
As y'all can see, the little plastic pin that holds the leg out gave out, and tape was required just to use the keyboard. (I used some of my sewing tape as it was not too wide for the job.)
Sigh. I loved the feel of the old keyboard, and I was used to the amber backlight that told me the keys were powered up even if nothing was going on elsewise.
After reading about keyboards in the internet and hunting about for a mechanical keyboard to replace the broken one, I settled on a Logitech one at Best Buy. I had it delivered because it's a headache to deal with curbside pickup for small things.
The new keyboard doesn't have the row of game oriented keys that were on the left edge of the old one--which I never used--and so it's an inch or two shorter across the front. As a bonus it also has a plug where the mouse can be attached and then a unified cable bundle carries the signals down to where the cable splits and each half goes into its own USB plug. I figure that it will keep down the amount of potential back-of-desk tangling that goes on.
The picture may not make it completely obvious, but the new keyboard has a white backlight thing going on. It came set so bright that I had to turn it down a couple of levels! Who wants a keyboard light so bright that they can practically read a paperback book by it?
A program note: sewing projects and embroidery projects are going on around here and I intend to describe them over the next few posts.
Saturday, August 18, 2018
Second day's walking, May 18
May 18 was chilly just like May 17 had been. In fact, the weather during the entire time we walked along the coast can be summarized as cool, with intermittent rain, and not that much sunshine. Local people said it was abnormally cool this spring.
We left Getaria around 6:30 or 7 in the morning and were grateful to have done our "get out of town" climb the night before.
At breakfast time we arrived in Zumaia--well breakfast time if you like to eat around 9:30 that is--and had a bite with cafe con leche at a bar. Then we wandered around town finding the scenic route out of town.
This scenic route is a part of the GR9 hikers' route. It is closer to the water for much of its way and the hiker who takes it gets to see some scenery that isn't visible at all from the other route. On the other hand, we discovered, it is more strenuous. We took this part of the GR9 and when it split off again later in the day we stayed with the main Camino trail. Others, who had skipped this part, took the GR9 later and said it was quite demanding for them. As this part turned out to be for us!
Looking back from the start of the GR9 segment, we saw some of the famous flysh rock layers. We also noticed that the church is on a cliff that is being undercut by the waves. Presumably it will be quite a while before the top falls down.
The trail here follows the cliff top on some goat trails. It was very up-and-down, but very pretty. By the time it connected back up to the main Camino trail, we were, as it used to be said, "tuckered out."
Farther along, we noticed that the local farmers have helpers to attend to a little bit of trail maintenance. Billy, here, appears to have been assigned to weed removal. We said soothing things and walked past him, and he was a very amiable old goat so our close up visit went smoothly.
We got to the outskirts of Deba and discovered that they have paved over some of the steep rocks approaching the town. They have added a red non-slip stripe on one side to help people negotiate the descent in wet weather. At the end of the red stripe, we saw a billboard celebrating their carefully conserved piece of Roman road and a steep asphalt road going into town a different way. We followed that way and found the famous elevator! Actually, there are two elevators, installed by the town for the people to get from their homes on a very steep slope down to the main part of the town. We enjoyed the elevator ride very much!
Sunday, October 15, 2017
Updating on the spin mop
A year or two back, I mentioned that we'd acquired a spin mop. (The Salad Spinner of floor cleaning!)
Well, it got its feelings hurt that I went out of town for a week and when I got home, DH told me that the fool gadget was failing to spin properly. It's hard to mop floors--or shower walls for that matter--if the mop head doesn't drain properly.
I had recently had no luck at all with a similar mop at a relative's house, so several of the ideas that would have been tried were already eliminated. I decided to fall back on one of the more tried-and-true fixes for sticky devices.
![]() |
| Liquid Wrench, next to the mop head. (Strands removed for the moment.) |
Saturday, December 10, 2016
During the holiday rush, daily life and maintenance incidents continue
It's been an incredibly busy week at ye Olde Homestead. There were family duties to attend, there was a Christmas party for (dozens of) school children to work at, and in the midst of it all, the modem died.
It was a couple of days before I could find time to figure out why the internet wasn't working.
I had two very productive phone conversations with ATT tech support (my ISP) and at the end of it, and a quick run over to Best Buy, we have a new modem in place and working.
There was a cabinet in the way of the phone plug/line filter combination. It's a tall cabinet and it was stuffed with fabric. After moving it, I concluded that this whole incident was a message from above: organize the sewing/craft room first, before other desired projects.
![]() |
| Where the big fabric cabinet was. |
Maybe there is a better way to organize all the stuff. Sewing up some more quilts would help, of course! And using up beads.
But definitely, the new arrangement will not have a large, laminated particle-board cabinet blocking the computer bits!
Wednesday, November 16, 2016
This week's Project is done
A small update on what has kept us so busy this week: varnish drying times.
It was time for the occasional re-varnishing of the door. As some of y'all already know, this involves sanding, wiping with the tack rag, and then applying varnish. In this case, it involved three go-rounds on this procedure. And on Monday the day was cloudy and humid all day long. It was after dark before we could close the door and keep the bugs out!
It is usual for the door to need treatment every two or three years. I just get up and get going with the sandpaper, then on a later coat it will be steel wool, and get the door to look pretty again. It's kind of like dusting, but it lasts longer.







